MBTA Service Alerts

Below is a snapshot of this feed from 25 July 2017 7:48 PM (39m 21s ago)
No trip updates were found in this feed
No vehicle positions were found in this feed
Elevator 941 NORTH STATION - Lobby to the Commuter Rail and Boston Garden will remain closed until further notice due to construction of the Boston Garden Development. If exiting, return to the fare lobby to use North Station Elevator 912 (lobby to Causeway Street) or pass through the fare gates, walk the full length of the Green Line platform to use North Station Elevator 909 (lobby to Valenti Way). If boarding, cross Causeway Street to use North Station Elevator 912 (lobby to street) or travel one-tenth of a mile down Haverhill Street to the entrance located at the intersection of Haverhill Street and Valenti Way.
Agency Route Type Stop Trip
1 - - 70026 -
1 - - 70027 -
1 - - 70205 -
1 - - 70206 -
Please board all trains on the inbound platforms at Haverhill and Bradford except Trains 216 (1:35 pm from Haverhill) and 222 (6:09 pm from Haverhill). Due to the Merrimack River Bridge project, trains that operate between Bradford and Haverhill will only use the inbound track. Trains that are bused between Haverhill and Bradford will board on the outbound platform at Bradford for service into Boston. Note: Train 216 (1:35 pm from Haverhill) and Train 222 (6:09 pm from Haverhill) are bused from Haverhill Station to Bradford Station. The outbound platform at Bradford may be accessed via the crossing that is south (to the right when facing the tracks from the parking lot) of the mini-high platforms. Alternatively, the outbound platform can also be accessed via the sidewalk from Laurel Avenue. Affected stops: Bradford Haverhill
Agency Route Type Stop Trip
1 CR-Haverhill Rail / Train Bradford -
1 CR-Haverhill Rail / Train Haverhill -
Access to the east entrance of North Station is available through a covered walkway. Legends Way is closed to pedestrian access. Customers are advised that the pedestrian route for customers transferring from the Green and Orange Line exits at Causeway and Beverly St into North Station Commuter Rail will be moved slightly to accommodate ongoing construction work. After crossing Causeway St, pedestrians will use a protected walkway along the east side of Legends Way, directly abutting Portal Park. The walkway will include a barrier and kick-plate for blind and low vision passengers. As an alternative, customers may consider utilizing the west exit from North Station Commuter Rail due to congestion.
Agency Route Type Stop Trip
1 Green-B Tram / Streetcar / Light Rail - -
1 Green-C Tram / Streetcar / Light Rail - -
1 Green-D Tram / Streetcar / Light Rail - -
1 Green-E Tram / Streetcar / Light Rail - -
1 Orange Subway / Metro - -
Beginning on Monday, May 1, 2017, access to the east entrance of North Station will be through a covered walkway. Legends way will be closed to pedestrian access. Customers are advised that on Monday, May 1, 2017, the pedestrian route for customers transferring from the Green and Orange Line exits at Causeway and Beverly St into North Station Commuter Rail will be moved slightly to accommodate ongoing construction work. After crossing Causeway St, pedestrians will use a protected walkway along the east side of Legends Way, directly abutting Portal Park. The walkway will include a barrier and kick-plate for blind and low vision passengers.
Agency Route Type Stop Trip
1 CR-Fitchburg Rail / Train - -
1 CR-Haverhill Rail / Train - -
1 CR-Lowell Rail / Train - -
1 CR-Newburyport Rail / Train - -
The pedestrian bridge at the Braintree Parking Garage will be closed through Summer 2020 due to construction. For access to Braintree Station during this closure, travel down to the first floor and use the pedestrian crosswalk to enter the station at the street level. This closure is due to the South Shore Parking Garages Improvements and Renovations Project. The pedestrian bridge will be replaced by a new garage lobby featuring elevators and stairwells. Affected routes: Red Line 210 230 236 Middleborough/Lakeville Line Kingston/Plymouth Line
Agency Route Type Stop Trip
1 Red Subway / Metro 70105 -
1 CR-Kingston Rail / Train Braintree -
1 CR-Middleborough Rail / Train Braintree -
1 210 Bus 38671 -
1 230 Bus 38671 -
1 236 Bus 38671 -
Silver Line - SL2 detoured. No service to 88 Black Falcon. Connections can be made at the corner of Dry Dock Ave & Black Falcon. Affected stops: 88 Black Falcon
Agency Route Type Stop Trip
1 742 Bus 31258 -
1 746 Bus 31258 -
The Providence side of the pedestrian bridge at Canton Junction is closed for repairs, requiring a 10-15 minute detour around the station to access other platforms. The pedestrian bridge work has resumed, as construction issues have been resolved. Work is progressing, and is now expected to complete in early August. During construction, the station will remain fully accessible and mini-high platforms will remain open. Access between Platform A (Providence outbound) and B/C/D (Providence inbound/Stoughton outbound/Stoughton inbound) will require a 10-15 minute walking detour around the station. This means, for example, passengers who take an inbound Providence or Stoughton train, but park on the outbound Providence side, will need an additional 10-15 minutes in the morning to access their platform via the sidewalk to the bridge at Spaulding Street. The first phase, which repaired the Stoughton side of the pedestrian bridge, is complete. Passengers should consider
Agency Route Type Stop Trip
1 CR-Providence Rail / Train Canton Junction -
Hancock St @ Cottage Ave (outbound) moving to the north, across Cottage Ave, due to construction. Affected routes: 215 225 230 236 238
Agency Route Type Stop Trip
1 215 Bus 3423 -
1 225 Bus 3423 -
1 230 Bus 3423 -
1 236 Bus 3423 -
1 238 Bus 3423 -
The following stops are closed due to construction: Loring Ave opp Jefferson Ave (outbound). Please board/exit at Loring Ave opp Raymond Rd. Affected routes: 455 459
Agency Route Type Stop Trip
1 455 Bus 6168 -
1 459 Bus 6168 -
Starting 6/5, the last 2 weekday outbound Fairmount Line trains, 787 (10:00 pm outbound) and 789 (11:00 pm outbound) will be replaced by buses due to construction of the new Blue Hill Avenue Station. Starting Saturday, June 3rd, major construction of the brand new, fully accessible Blue Hill Avenue Station on the Fairmount Line will take place on weekends and in the evening weekday hours for up to twenty-four months. During this time, the last two weeknight outbound Fairmount Line trains from South Station will be replaced with dedicated shuttle buses serving all stops between South Station and Readville. A schedule will be put into effect, effective June 3rd, to account for busing, and is available on the Fairmount Line schedule page on mbta.com.
Agency Route Type Stop Trip
1 CR-Fairmount Rail / Train - -
Starting 6/3, all weekend Fairmount Line trains will be bused between Morton St. and Readville in both directions due to construction of the new Blue Hill Avenue Station. Starting Saturday, June 3rd, major construction of the brand new, fully accessible Blue Hill Avenue Station on the Fairmount Line will take place on weekends and in the evening weekday hours for up to twenty-four months. During this time, all weekend Fairmount Line trains will be bused between Morton Street and Readville in both directions. A schedule will be put into effect, effective June 3rd, to account for busing, and is available on the Fairmount Line schedule page on mbta.com. Affected stops: Morton Street Fairmount Readville
Agency Route Type Stop Trip
1 CR-Fairmount Rail / Train Fairmount -
1 CR-Fairmount Rail / Train Morton Street -
1 CR-Fairmount Rail / Train Readville -
Beginning Monday, June 12, the pedestrian walkway near Kendall/MIT Station (inbound) will be closed due to MIT construction. Access to the Kendall/MIT Station will remain open and accessible on the Main Street side of the station throughout this construction. The pedestrian plaza between Carleton Street and Main Street in Kendall Square will be closed due to the construction of an underground garage. Customers are encouraged to utilize alternative paths to/from the station using the paths on Ames Street, Dock Street, or Wadsworth Street. Affected routes: Red Line
Agency Route Type Stop Trip
1 Red Subway / Metro 70071 -
1 Red Subway / Metro 70072 -
UMass Boston Busway (inbound & outbound) has temporarily moved to the Campus Center shuttle location until further notice due to construction. Affected routes: 8 16
Agency Route Type Stop Trip
1 16 Bus 11111 -
1 8 Bus 11111 -
Due to the Fore River Bridge Project, two additional trips will be added to the weekday Hingham Ferry schedule. Additional Trips: 7:30 am from Hingham Shipyard to Rowes Wharf 6:15 pm from Rowes Wharf to Hingham The additional service will remain in effect on weekdays until further notice.
Agency Route Type Stop Trip
1 Boat-F1 Ferry - -
The bus stop at Western Ave @ Mackin St is moving about 210 feet east to the front of the Irving Gas Station (500 Western Ave.) beginning Sat Jun 24 until Sep 2018. Affected routes: 70 - Inbound 70A - Inbound 86 - Outbound
Agency Route Type Stop Trip
1 70 Bus 1043 -
1 70A Bus 1043 -
1 86 Bus 1043 -
Main St @ Kendall Station - Red Line - moving permanently to the area east of the crosswalk, where buses currently layover, beginning Monday, June 26. Affected routes: CT2 64 68 85
Agency Route Type Stop Trip
1 64 Bus 2231 -
1 68 Bus 2231 -
1 747 Bus 2231 -
1 85 Bus 2231 -
Elevator 804 PARK STREET - Tremont Street to the Lobby will be reconstructed and will remain out of service until January 2018. If entering the station, cross Tremont Street to the Boston Common and use Park Street Elevator 978 to the Green Line westbound platform. Red Line platform access is available via the elevator beyond the fare gates. If exiting the station, please travel down the Winter Street Concourse toward Downtown Crossing Station, exit through the fare gates, and take Downtown Crossing Elevator 892 to the street level.
Agency Route Type Stop Trip
1 - - 70075 -
1 - - 70076 -
1 - - 70196 -
1 - - 70197 -
1 - - 70198 -
1 - - 70199 -
1 - - 70200 -
All Orange Line train service will board on Track 2 at Forest Hills through September 2017, due to the Casey Overpass Project. Affected stops: Forest Hills
Agency Route Type Stop Trip
1 Orange Subway / Metro 70001 -
Shuttle buses, making all stops, will replace all weekend service on the Newburyport/Rockport Line from July 8th through September 30th. The MBTA will install federally mandated Positive Train Control (PTC) systems along the Newburyport/Rockport Line to improve safety by reducing train collisions and derailments. This work will require weekend shutdowns on the entire line from July 8 through September 30. To help passengers travel between Boston and the North Shore, the MBTA is running ADA accessible bus shuttles (with WiFi and restroom facilities) that will make stops at every Commuter Rail station. During this time, the special weekend fare will be $10 roundtrip, and Zone 3 or higher monthly passes will be accepted. Additionally, parking will be free at all stations north of Beverly Depot.
Agency Route Type Stop Trip
1 CR-Newburyport Rail / Train - -
Please board all peak outbound Worcester Line trains on the inbound platforms at Yawkey through Framingham stations weekdays from 3:30 pm until 7:40 pm. Affected direction: Outbound Affected stops: Yawkey Boston Landing Newtonville West Newton Auburndale Wellesley Farms Wellesley Hills Wellesley Square Natick Center West Natick Framingham Affected trips: 517 (3:30 pm from South Station) 519 (4:20 pm from South Station) 591 (4:30 pm from South Station) 521 (5:00 pm from South Station) 593 (5:10 pm from South Station) 523 (5:40 pm from South Station) 595 (5:50 pm from South Station) 525 (6:15 pm from South Station) 527 (6:45 pm from South Station)
Agency Route Type Stop Trip
1 CR-Worcester Rail / Train Auburndale CR-Weekday-Spring-17-517
1 CR-Worcester Rail / Train Boston Landing CR-Weekday-Spring-17-517
1 CR-Worcester Rail / Train Framingham CR-Weekday-Spring-17-517
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Spring-17-517
1 CR-Worcester Rail / Train Newtonville CR-Weekday-Spring-17-517
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Spring-17-517
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Spring-17-517
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Spring-17-517
1 CR-Worcester Rail / Train West Natick CR-Weekday-Spring-17-517
1 CR-Worcester Rail / Train West Newton CR-Weekday-Spring-17-517
1 CR-Worcester Rail / Train Yawkey CR-Weekday-Spring-17-517
1 CR-Worcester Rail / Train Auburndale CR-Weekday-Spring-17-519
1 CR-Worcester Rail / Train Boston Landing CR-Weekday-Spring-17-519
1 CR-Worcester Rail / Train Framingham CR-Weekday-Spring-17-519
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Spring-17-519
1 CR-Worcester Rail / Train Newtonville CR-Weekday-Spring-17-519
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Spring-17-519
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Spring-17-519
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Spring-17-519
1 CR-Worcester Rail / Train West Natick CR-Weekday-Spring-17-519
1 CR-Worcester Rail / Train West Newton CR-Weekday-Spring-17-519
1 CR-Worcester Rail / Train Yawkey CR-Weekday-Spring-17-519
1 CR-Worcester Rail / Train Auburndale CR-Weekday-Spring-17-521
1 CR-Worcester Rail / Train Boston Landing CR-Weekday-Spring-17-521
1 CR-Worcester Rail / Train Framingham CR-Weekday-Spring-17-521
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Spring-17-521
1 CR-Worcester Rail / Train Newtonville CR-Weekday-Spring-17-521
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Spring-17-521
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Spring-17-521
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Spring-17-521
1 CR-Worcester Rail / Train West Natick CR-Weekday-Spring-17-521
1 CR-Worcester Rail / Train West Newton CR-Weekday-Spring-17-521
1 CR-Worcester Rail / Train Yawkey CR-Weekday-Spring-17-521
1 CR-Worcester Rail / Train Auburndale CR-Weekday-Spring-17-523
1 CR-Worcester Rail / Train Boston Landing CR-Weekday-Spring-17-523
1 CR-Worcester Rail / Train Framingham CR-Weekday-Spring-17-523
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Spring-17-523
1 CR-Worcester Rail / Train Newtonville CR-Weekday-Spring-17-523
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Spring-17-523
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Spring-17-523
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Spring-17-523
1 CR-Worcester Rail / Train West Natick CR-Weekday-Spring-17-523
1 CR-Worcester Rail / Train West Newton CR-Weekday-Spring-17-523
1 CR-Worcester Rail / Train Yawkey CR-Weekday-Spring-17-523
1 CR-Worcester Rail / Train Auburndale CR-Weekday-Spring-17-525
1 CR-Worcester Rail / Train Boston Landing CR-Weekday-Spring-17-525
1 CR-Worcester Rail / Train Framingham CR-Weekday-Spring-17-525
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Spring-17-525
1 CR-Worcester Rail / Train Newtonville CR-Weekday-Spring-17-525
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Spring-17-525
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Spring-17-525
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Spring-17-525
1 CR-Worcester Rail / Train West Natick CR-Weekday-Spring-17-525
1 CR-Worcester Rail / Train West Newton CR-Weekday-Spring-17-525
1 CR-Worcester Rail / Train Yawkey CR-Weekday-Spring-17-525
1 CR-Worcester Rail / Train Auburndale CR-Weekday-Spring-17-527
1 CR-Worcester Rail / Train Boston Landing CR-Weekday-Spring-17-527
1 CR-Worcester Rail / Train Framingham CR-Weekday-Spring-17-527
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Spring-17-527
1 CR-Worcester Rail / Train Newtonville CR-Weekday-Spring-17-527
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Spring-17-527
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Spring-17-527
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Spring-17-527
1 CR-Worcester Rail / Train West Natick CR-Weekday-Spring-17-527
1 CR-Worcester Rail / Train West Newton CR-Weekday-Spring-17-527
1 CR-Worcester Rail / Train Yawkey CR-Weekday-Spring-17-527
1 CR-Worcester Rail / Train Auburndale CR-Weekday-Spring-17-591
1 CR-Worcester Rail / Train Boston Landing CR-Weekday-Spring-17-591
1 CR-Worcester Rail / Train Framingham CR-Weekday-Spring-17-591
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Spring-17-591
1 CR-Worcester Rail / Train Newtonville CR-Weekday-Spring-17-591
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Spring-17-591
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Spring-17-591
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Spring-17-591
1 CR-Worcester Rail / Train West Natick CR-Weekday-Spring-17-591
1 CR-Worcester Rail / Train West Newton CR-Weekday-Spring-17-591
1 CR-Worcester Rail / Train Yawkey CR-Weekday-Spring-17-591
1 CR-Worcester Rail / Train Auburndale CR-Weekday-Spring-17-593
1 CR-Worcester Rail / Train Boston Landing CR-Weekday-Spring-17-593
1 CR-Worcester Rail / Train Framingham CR-Weekday-Spring-17-593
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Spring-17-593
1 CR-Worcester Rail / Train Newtonville CR-Weekday-Spring-17-593
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Spring-17-593
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Spring-17-593
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Spring-17-593
1 CR-Worcester Rail / Train West Natick CR-Weekday-Spring-17-593
1 CR-Worcester Rail / Train West Newton CR-Weekday-Spring-17-593
1 CR-Worcester Rail / Train Yawkey CR-Weekday-Spring-17-593
1 CR-Worcester Rail / Train Auburndale CR-Weekday-Spring-17-595
1 CR-Worcester Rail / Train Boston Landing CR-Weekday-Spring-17-595
1 CR-Worcester Rail / Train Framingham CR-Weekday-Spring-17-595
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Spring-17-595
1 CR-Worcester Rail / Train Newtonville CR-Weekday-Spring-17-595
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Spring-17-595
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Spring-17-595
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Spring-17-595
1 CR-Worcester Rail / Train West Natick CR-Weekday-Spring-17-595
1 CR-Worcester Rail / Train West Newton CR-Weekday-Spring-17-595
1 CR-Worcester Rail / Train Yawkey CR-Weekday-Spring-17-595
Please board inbound Worcester Line trains on the outbound platforms at Framingham through Yawkey stations from 3:30 pm until 8:00 pm. Please follow these boarding instructions Monday - Friday unless noted otherwise or if operating on a holiday schedule. Affected direction: Inbound Affected stops: Framingham West Natick Natick Center Wellesley Square Wellesley Hills Wellesley Farms Boston Landing Yawkey Affected trips: 520 (3:50 pm from Worcester) 522 (5:20 pm from Worcester) 524 (6:05 pm from Worcester) 592 (5:40 pm from Framingham) 594 (6:20 pm from Framingham) 596 (7:05 pm from Framingham)
Agency Route Type Stop Trip
1 CR-Worcester Rail / Train Boston Landing CR-Weekday-Spring-17-520
1 CR-Worcester Rail / Train Framingham CR-Weekday-Spring-17-520
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Spring-17-520
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Spring-17-520
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Spring-17-520
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Spring-17-520
1 CR-Worcester Rail / Train West Natick CR-Weekday-Spring-17-520
1 CR-Worcester Rail / Train Yawkey CR-Weekday-Spring-17-520
1 CR-Worcester Rail / Train Boston Landing CR-Weekday-Spring-17-522
1 CR-Worcester Rail / Train Framingham CR-Weekday-Spring-17-522
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Spring-17-522
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Spring-17-522
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Spring-17-522
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Spring-17-522
1 CR-Worcester Rail / Train West Natick CR-Weekday-Spring-17-522
1 CR-Worcester Rail / Train Yawkey CR-Weekday-Spring-17-522
1 CR-Worcester Rail / Train Boston Landing CR-Weekday-Spring-17-524
1 CR-Worcester Rail / Train Framingham CR-Weekday-Spring-17-524
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Spring-17-524
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Spring-17-524
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Spring-17-524
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Spring-17-524
1 CR-Worcester Rail / Train West Natick CR-Weekday-Spring-17-524
1 CR-Worcester Rail / Train Yawkey CR-Weekday-Spring-17-524
1 CR-Worcester Rail / Train Boston Landing CR-Weekday-Spring-17-592
1 CR-Worcester Rail / Train Framingham CR-Weekday-Spring-17-592
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Spring-17-592
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Spring-17-592
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Spring-17-592
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Spring-17-592
1 CR-Worcester Rail / Train West Natick CR-Weekday-Spring-17-592
1 CR-Worcester Rail / Train Yawkey CR-Weekday-Spring-17-592
1 CR-Worcester Rail / Train Boston Landing CR-Weekday-Spring-17-594
1 CR-Worcester Rail / Train Framingham CR-Weekday-Spring-17-594
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Spring-17-594
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Spring-17-594
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Spring-17-594
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Spring-17-594
1 CR-Worcester Rail / Train West Natick CR-Weekday-Spring-17-594
1 CR-Worcester Rail / Train Yawkey CR-Weekday-Spring-17-594
1 CR-Worcester Rail / Train Boston Landing CR-Weekday-Spring-17-596
1 CR-Worcester Rail / Train Framingham CR-Weekday-Spring-17-596
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Spring-17-596
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Spring-17-596
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Spring-17-596
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Spring-17-596
1 CR-Worcester Rail / Train West Natick CR-Weekday-Spring-17-596
1 CR-Worcester Rail / Train Yawkey CR-Weekday-Spring-17-596
Shuttle buses replacing Green Line B branch service between Blandford Street & Babcock Street from 7/26 - 8/13 due to the MassDOT Comm Ave Bridge Project. Additional Green Line trolley service will operate on the C branch. Hubway will also provided additional bikes along Commonwealth Ave for customers to use as an alternative, and intermediate destinations along Commonwealth Ave are walkable from Blandford and Babcock Streets. The below stations will have no Green Line trolley service. Please board shuttle buses at these locations: Blandford Street (Inbound - board at Comm Ave @ Blandford, Outbound - Comm Ave @ Silber Way) Boston Univ. East (Inbound - board at Comm Ave @ Hinsdale Mall, Outbound - Comm Ave @ Granby St) Boston Univ. Central (No inbound connections, Outbound - Comm Ave @ St. Mary's St) Boston Univ. West (No inbound connections, Outbound 855 Comm Ave) Saint Paul Street (Inbound - board at Comm Ave @ St. Paul
Agency Route Type Stop Trip
1 Green-B Tram / Streetcar / Light Rail 70136 -
1 Green-B Tram / Streetcar / Light Rail 70137 -
1 Green-B Tram / Streetcar / Light Rail 70138 -
1 Green-B Tram / Streetcar / Light Rail 70139 -
1 Green-B Tram / Streetcar / Light Rail 70140 -
1 Green-B Tram / Streetcar / Light Rail 70141 -
1 Green-B Tram / Streetcar / Light Rail 70142 -
1 Green-B Tram / Streetcar / Light Rail 70143 -
1 Green-B Tram / Streetcar / Light Rail 70144 -
1 Green-B Tram / Streetcar / Light Rail 70145 -
1 Green-B Tram / Streetcar / Light Rail 70146 -
1 Green-B Tram / Streetcar / Light Rail 70147 -
1 Green-B Tram / Streetcar / Light Rail 70148 -
1 Green-B Tram / Streetcar / Light Rail 70149 -
CT2 and 47 detoured from Thu Jul 27 at 7:00 PM through Sun Aug 13 due to the MassDOT Comm Ave Bridge Project. Inbound connections can be made at the BU Bridge @ Comm Ave or Saint Mary's St @ Comm Ave. Outbound Connections can be made at Comm Ave @ Saint Mary's St or Comm Ave @ University Road Affected stops: Mountfort St @ Carlton St (outbound) Mountfort St @ Lenox St (inbound)
Agency Route Type Stop Trip
1 47 Bus - -
1 747 Bus - -
Route 57 (Inbound) stops at Comm Ave @ St Paul St and Comm Ave @ Carlton St will be temporarily closed from Thu Jul 27 at 7:00 PM through Sun Aug 13 due to the MassDOT Comm Ave Bridge Project. Please use nearby inbound stops on Comm Ave @ Pleasant St or @ St. Mary's St as an alternative. Outbound service on the Route 57 will operate as usual on Commonwealth Ave Affected routes: 57 57A
Agency Route Type Stop Trip
1 57 Bus 935 -
1 57 Bus 937 -
1 57A Bus 935 -
1 57A Bus 937 -
Please board all weekend Fairmount Line trains on the inbound platforms at Morton Street and Talbot Ave stations. Affected stops: Talbot Avenue Morton Street
Agency Route Type Stop Trip
1 CR-Fairmount Rail / Train Morton Street -
1 CR-Fairmount Rail / Train Talbot Avenue -
Framingham/Worcester Line suspended between Boston Landing and South Station on 7/29 - 7/30 & 8/5 - 8/6 due to MassDOT Comm. Ave. Bridge Replacement. Due to MassDOT construction activity, service will be suspended between Boston Landing and South Station in both directions on the following dates: - Saturday July 29th 2017 through Sunday July 30th, 2017 - Saturday August 5th through Sunday August 6th, 2017 Shuttle buses will run between Boston Landing and Reservoir Station on the Green Line. For service to/from Yawkey, use Kenmore. For Back Bay, use Copley. For South Station, transfer between the Green and Red lines at Park Street. Due to road closures, there will be no direct shuttle bus service to Yawkey, Back Bay, or South Station. Outbound Framingham/Worcester trains will depart Boston Landing at their regularly scheduled weekend times. There will be service between Boston Landing and Yawkey Station for Red Sox games on 7/29, 7/30, 8/5, 8/6. Inbound shuttles from
Agency Route Type Stop Trip
1 CR-Worcester Rail / Train Back Bay -
1 CR-Worcester Rail / Train Boston Landing -
1 CR-Worcester Rail / Train South Station -
1 CR-Worcester Rail / Train Yawkey -
Salem Station: The passenger pickup/drop-off area (kiss and ride) will be re-located to Bridge Street on weekdays 7/17- 8/11 to accommodate shuttle bus traffic. Please follow signage and staff direction to the designated pickup/drop-off area. This change is to accommodate the shuttles being used as part of the Beverly Drawbridge Replacement Project.
Agency Route Type Stop Trip
1 CR-Newburyport Rail / Train Salem -
Routes 110 and 111 (outbound) detoured from Wednesday, July 26, through Sunday, July 30, due to construction. Connections can be made at 40 Park Ave and Park Ave @ Busway Entrance. Affected direction: Outbound Affected stops: Broadway @ Park Ave (Firehouse)
Agency Route Type Stop Trip
1 110 Bus - -
1 111 Bus - -
Route 64 diverted along part of Guest Street and all of Life Street due to construction. Inbound connections - at North Beacon @ Etna Street Outbound connections - at North Beacon @ Life Street. Affected stops: Arthur St @ Guest St - Stop & Shop (outbound) Guest St @ Life St (outbound) Life St @ Guest St (inbound) Arthur St @ Guest St - Stop & Shop (inbound)
Agency Route Type Stop Trip
1 64 Bus 11070 -
1 64 Bus 11071 -
1 64 Bus 11971 -
1 64 Bus 11972 -
Shuttle buses replace Orange Line service between Wellington and Oak Grove Stations on the weekends of July 22 - 23, 29 - 30, and Aug. 5 - 6, from start to end of service. Due to necessary track work, buses will replace Orange Line service in both directions between Wellington and Oak Grove Stations from start to end of service on the following weekends: - Saturday, July 22 and Sunday, July 23, 2017 - Saturday, July 29 and Sunday, July 30, 2017 - Saturday, August 5 and Sunday, August 6, 2017 Regular Orange Line train service will resume at the start of service on the following Monday. All shuttle bus stops are accessible for persons with disabilities. Shuttling the following stops: Oak Grove Malden Center Wellington
Agency Route Type Stop Trip
1 Orange Subway / Metro 70032 -
1 Orange Subway / Metro 70033 -
1 Orange Subway / Metro 70034 -
1 Orange Subway / Metro 70035 -
1 Orange Subway / Metro 70036 -
The Route 439 (outbound) bus stop at 27 Beach Rd will permanently close beginning Monday, July 31. Please board at Beach Rd @ Surfside Rd as an alternative. Affected routes: 439
Agency Route Type Stop Trip
1 439 Bus 6606 -
The Route 465 (outbound) bus stop at Washington St @ Federal St is temporarily closed through Friday, August 11, due to the Newburyport/Rockport Line shuttle. Please board outbound Route 465 service at the Salem Depot busway as an alternative. Affected routes: 465
Agency Route Type Stop Trip
1 465 Bus 4452 -
Please board inbound Worcester Train 590 (8:34 am from Ashland) on the outbound platform at Ashland Station until further notice. Affected direction: Inbound Affected stops: Ashland
Agency Route Type Stop Trip
1 CR-Worcester Rail / Train Ashland CR-Weekday-Spring-17-590
Shuttle buses, making all stops, will replace all weekday service north of Salem on the Newburyport/Rockport Line from July 17th through August 13th. Replacement of the Beverly Drawbridge, located between Salem and Beverly Depot stations, will take place from July 17 to August 13. During this time, there will be no weekday train service north of Salem Station. To help passengers make their way between the North Shore and Boston, the MBTA is running ADA accessible bus shuttles (with WiFi and restroom facilities) between Newburyport and Salem and between Rockport and Salem that will make stops at every Commuter Rail station. During the months of July and August, Zone 3 monthly passes will be accepted at all stations north of Salem on the Newburyport/Rockport Line. Additionally, during construction parking will be free at all stations north of Beverly Depot. During this time, weekday passengers are discouraged from parking at Salem Station due to congestion. The city of Salem
Agency Route Type Stop Trip
1 CR-Newburyport Rail / Train Beverly -
1 CR-Newburyport Rail / Train Beverly Farms -
1 CR-Newburyport Rail / Train Gloucester -
1 CR-Newburyport Rail / Train Hamilton/ Wenham -
1 CR-Newburyport Rail / Train Ipswich -
1 CR-Newburyport Rail / Train Manchester -
1 CR-Newburyport Rail / Train Montserrat -
1 CR-Newburyport Rail / Train Newburyport -
1 CR-Newburyport Rail / Train North Beverly -
1 CR-Newburyport Rail / Train Prides Crossing -
1 CR-Newburyport Rail / Train Rockport -
1 CR-Newburyport Rail / Train Rowley -
1 CR-Newburyport Rail / Train West Gloucester -
Shuttle buses will replace all weekday service north of Salem on the Newburyport/Rockport Line from July 17th through August 13th. Replacement of the Beverly Drawbridge, located between Salem and Beverly Depot stations, will take place from July 17 to August 13. During this time, there will be no weekday train service north of Salem Station. To help passengers make their way between the North Shore and Boston, the MBTA is running ADA accessible bus shuttles (with WiFi and restroom facilities) between Newburyport and Salem and between Rockport and Salem that will make stops at every Commuter Rail station. During this time, a different schedule will be used for bus and train service.
Agency Route Type Stop Trip
1 CR-Newburyport Rail / Train - -
Shuttle buses, making all stops, will replace all weekend service on the Lowell Line from August 5th through October 1st due to the installation of PTC. A public meeting will be held on Wednesday, July 26th at 6:30 pm at Lowell City Hall, Mayor's Reception Room, 375 Merrimack Street, Lowell. The MBTA will install federally mandated Positive Train Control (PTC) systems along the Lowell Line to improve safety by reducing train collisions and derailments. This work will require weekend shutdowns on the entire line from August 5 through October 1. To help passengers travel between Boston and Lowell, the MBTA is running ADA accessible bus shuttles (with WiFi and restroom facilities) that will make stops at every Commuter Rail station.
Agency Route Type Stop Trip
1 CR-Lowell Rail / Train - -
Route 91 detoured due to construction. Due to construction and new traffic patterns, the following stop changes will be made: Closed Stop: 30 Prospect St. will not be serviced by Route 91 Outbound New Stop: Somerville Ave. @ Prospect St. will be serviced by Route 91 Outbound
Agency Route Type Stop Trip
1 91 Bus - -
Fitchburg Line service will be suspended between Porter Square & North Station this Saturday, July 29. Subway connections provided at Porter Square & North Station. There will be no direct shuttle bus connection to/from Boston. Due to Green Line Extension construction in Somerville, Fitchburg line service will be suspended between Porter Square and North Station in both directions on the following date: - Saturday, July 29, 2017 Inbound Fitchburg Line service will terminate at Porter Square where passengers can connect with the Red Line for service to Boston. Passengers desiring outbound Fitchburg Line service from Boston must take the Red Line to Porter Square Station for Commuter Rail connection. There will be no direct connection between Porter Square and North Station. Passengers are to allow approximately thirty minutes of travel time from North Station to Porter Square utilizing alternate transportation. Outbound trains will depart at their scheduled times from
Agency Route Type Stop Trip
1 CR-Fitchburg Rail / Train - -
Route 451 detoured from 4:00 PM to 8:00 PM on Wednesday, July 26, due to the Beverly Grand Prix. Cabot Street will be closed between Bow Street and Dane Street. Inbound connections can be made at: Elliot St @ Rantoul St and Cabot St @ Vestry St. Outbound connections can be made at: Cabot St @ Thorndike St Affected stops: Cabot St @ Essex St (outbound) Cabot St @ Dane St (outbound) Cabot St opp Elliot St (outbound) Elliot St @ Mechanic St (inbound) Cabot St @ Roundy St (inbound) Cabot St @ Judson St (inbound) Cabot St @ Pond St (inbound) Cabot St @ Federal St (inbound)
Agency Route Type Stop Trip
1 451 Bus 17170 -
1 451 Bus 7127 -
1 451 Bus 7128 -
1 451 Bus 7129 -
1 451 Bus 7130 -
1 451 Bus 7131 -
1 451 Bus 7172 -
1 451 Bus 7173 -
Route 451 detoured from 2:00 PM to 10:00 PM on Saturday, July 29, due to Beverly Block Party. Cabot Street will be closed between Bow Street and Dane Street. Inbound connections can be made at: Elliot St @ Rantoul St and Cabot St @ Vestry St. Outbound connections can be made at: Cabot St @ Thorndike St Affected stops: Cabot St @ Essex St (outbound) Cabot St @ Dane St (outbound) Cabot St opp Elliot St (outbound) Elliot St @ Mechanic St (inbound) Cabot St @ Roundy St (inbound) Cabot St @ Judson St (inbound) Cabot St @ Pond St (inbound) Cabot St @ Federal St (inbound)
Agency Route Type Stop Trip
1 451 Bus - -
Route 558 detoured due to road work. Connect at Washington St @ Jewett St (outbound), Watertown St @ Chapel St (outbound), Watertown St @ Adams St (inbound), and Washington St @ Jewett St (inbound). Bypassed stops: Adams St @ Washington St (outbound) Adams St @ Middle St (outbound) Adams St @ Watertown St (outbound) Adams St @ Quirk St (inbound) Adams St @ Lincoln Rd (inbound) Adams St @ Washington St (inbound) Connections: Washington St @ Jewett St (outbound) Watertown St @ Chapel St (outbound) Watertown St @ Adams St (inbound) Washington St @ Jewett St (inbound)
Agency Route Type Stop Trip
1 558 Bus 7634 -
1 558 Bus 7641 -
1 558 Bus 7800 -
1 558 Bus 7801 -
1 558 Bus 7802 -
1 558 Bus 78571 -
1 558 Bus 78573 -
1 558 Bus 7858 -
1 558 Bus 8171 -
1 558 Bus 8187 -
Shuttle buses replace Mattapan Trolley service on Sat Jul 29 due to track work. Due to track work, the Mattapan Line will be suspended in both directions on Saturday July, 29th. Regular Mattapan Line service will resume at the start of service on Sunday July 30th
Agency Route Type Stop Trip
1 Mattapan Tram / Streetcar / Light Rail - -
Route 236 detoured due to construction. Connect at Commercial St opp John Paul Circle (outbound), Commercial St opp Erickson St (outbound), Commercial St @ John Paul Circle (inbound), and Franklin St @ Penns Hill Rd (inbound). Bypassed stops: Commercial St @ Bower Rd (outbound) Commercial St @ John Paul Circle (inbound) Connections: Commercial St opp John Paul Circle (outbound) Commercial St opp Erickson St (outbound) Commercial St @ John Paul Circle (inbound) Franklin St @ Penns Hill Rd (inbound)
Agency Route Type Stop Trip
1 236 Bus 38486 -
1 236 Bus 38487 -
1 236 Bus 38488 -
1 236 Bus 39675 -
1 236 Bus 39676 -
1 236 Bus 39677 -
Elevator 912 NORTH STATION - Lobby to Causeway St unavailable due to maintenance. If exiting, pass through the fare gates and walk the full length of the Green Line platform to reach the opposite lobby at Valenti Way. At this lobby, use North Station Elevator 909 (lobby to Valenti Way) to reach the street level. If boarding, travel one-tenth of a mile down Haverhill Street to the entrance located at the intersection of Haverhill Street and Valenti Way.
Agency Route Type Stop Trip
1 - - 70026 -
1 - - 70027 -
1 - - 70205 -
1 - - 70206 -
Route 111 experiencing moderate delays.
Agency Route Type Stop Trip
1 111 Bus - -
Route 101 experiencing moderate delays.
Agency Route Type Stop Trip
1 101 Bus - -
Route 11 detoured due to construction - Connect at A St @ Mt Washington Ave & W Broadway @ Broadway Station. Affected direction: Outbound Affected stops: W Second St opp W Third St Connections: A St @ Mt Washington Ave W Broadway @ Broadway Station
Agency Route Type Stop Trip
1 11 Bus 11319 -
1 11 Bus 11419 -
1 11 Bus 151 -
Route 9 inbound detoured on Wednesday, July 26, from start of service until 12:00 PM due to construction. Inbound connections can be made at: Saint James Ave @ Dartmouth St and Boylston St @ Dartmouth St Affected direction: Inbound Affected stops: Ring Rd @ Huntington Ave Ring Rd @ Boylston St
Agency Route Type Stop Trip
1 9 Bus 174 -
1 9 Bus 179 -
Route 111 detoured outbound detoured due to closure of the Tobin Bridge. No service to Beacon St or Park St at Williams St. Connect on Park St at Cross St. Affected direction: Outbound Bypassed stops: Beacon St @ Broadway Park St @ Williams St Connections can be made at: Park St @ Cross St
Agency Route Type Stop Trip
1 111 Bus 5611 -
1 111 Bus 5612 -
1 111 Bus 5613 -
Shuttle buses will replace Kingston Line Train 057 from Braintree Station making all stops en route to Kingston Station.
Agency Route Type Stop Trip
1 CR-Kingston Rail / Train - CR-Weekday-Spring-17-057
Route 96 experiencing moderate delays due to traffic.
Agency Route Type Stop Trip
1 96 Bus - -

About This GTFS-RealTime Feed