MBTA Service Alerts

Below is a snapshot of this feed from 25 March 2017 3:10 AM (16m ago)
No trip updates were found in this feed
No vehicle positions were found in this feed
Elevator 941 NORTH STATION - Lobby to the Commuter Rail and Boston Garden will remain closed until further notice due to construction of the Boston Garden Development. If exiting, return to the fare lobby to use North Station Elevator 912 (lobby to Causeway Street) or pass through the fare gates, walk the full length of the Green Line platform to use North Station Elevator 909 (lobby to Valenti Way). If boarding, cross Causeway Street to use North Station Elevator 912 (lobby to street) or travel one-tenth of a mile down Haverhill Street to the entrance located at the intersection of Haverhill Street and Valenti Way.
Agency Route Type Stop Trip
1 - - 70026 -
1 - - 70027 -
1 - - 70205 -
1 - - 70206 -
Due to the Simon Company's Copley Place construction, Back Bay Stations Dartmouth Street underpass will remain closed until April 8, 2017. Due to Copley Place construction being performed by the Simon Company, the Dartmouth Street underpass leading to and from the west side of Dartmouth Street at Back Bay Station will be temporarily closed until April 8, 2017. Customers are encouraged to use the stations main entrance on the east side of Dartmouth Street during the underpass closure. Affected routes: Orange Line Framingham/Worcester Line Needham Line Franklin Line Providence/Stoughton Line
Agency Route Type Stop Trip
1 Orange Subway / Metro 70014 -
1 Orange Subway / Metro 70015 -
1 CR-Franklin Rail / Train Back Bay -
1 CR-Needham Rail / Train Back Bay -
1 CR-Providence Rail / Train Back Bay -
1 CR-Worcester Rail / Train Back Bay -
Elevator 804 PARK STREET - Tremont Street to the Lobby will be reconstructed and will be out of service through June 2017. If entering the station, cross Tremont Street to the Boston Common and use Park Street Elevator 978 to the Green Line westbound platform. Red Line platform access is available via the elevator beyond the fare gates. If exiting the station, please travel down the Winter Street Concourse toward Downtown Crossing Station, exit through the fare gates, and take Downtown Crossing Elevator 892 to the street level.
Agency Route Type Stop Trip
1 - - 70075 -
1 - - 70076 -
1 - - 70196 -
1 - - 70197 -
1 - - 70198 -
1 - - 70199 -
1 - - 70200 -
Due to construction, Cambridge Street @ Berkshire Street (inbound) moved approximately one block to the far side of Berkshire Street until July 2017. Affected routes: 69
Agency Route Type Stop Trip
1 69 Bus 1409 -
Please board all trains on the inbound platforms at Haverhill and Bradford except Trains 216 (1:35 pm from Haverhill) and 222 (6:09 pm from Haverhill). Due to the Merrimack River Bridge project, trains that operate between Bradford and Haverhill will only use the inbound track. Trains that are bused between Haverhill and Bradford will board on the outbound platform at Bradford for service into Boston. Note: Train 216 (1:35 pm from Haverhill) and Train 222 (6:09 pm from Haverhill) are bused from Haverhill Station to Bradford Station. The outbound platform at Bradford may be accessed via the crossing that is south (to the right when facing the tracks from the parking lot) of the mini-high platforms. Alternatively, the outbound platform can also be accessed via the sidewalk from Laurel Avenue. Affected stops: Bradford Haverhill
Agency Route Type Stop Trip
1 CR-Haverhill Rail / Train Bradford -
1 CR-Haverhill Rail / Train Haverhill -
Pedestrian access to North Station will be along Legends Way through April 2017, due to the Hub on Causeway Project. The new path of travel will be along a protected path along Legends Way and across Causeway Street to the station entrances along Haverhill Street. The path will include a barrier and kick-plate for blind and low vision passengers.
Agency Route Type Stop Trip
1 Green-B Tram / Streetcar / Light Rail - -
1 Green-C Tram / Streetcar / Light Rail - -
1 Green-D Tram / Streetcar / Light Rail - -
1 Green-E Tram / Streetcar / Light Rail - -
1 Orange Subway / Metro - -
Pedestrian access to North Station will be along Legends Way through April 2017, due to the Hub on Causeway Project. The new path of travel will be along a protected path along Legends Way and across Causeway Street to the station entrances along Haverhill Street. The path will include a barrier and kick-plate for blind and low vision passengers.
Agency Route Type Stop Trip
1 CR-Fitchburg Rail / Train - -
1 CR-Haverhill Rail / Train - -
1 CR-Lowell Rail / Train - -
1 CR-Newburyport Rail / Train - -
Please board inbound Worcester Line trains on the outbound platforms at Framingham through Wellesley Farms stations weekdays from 2:30 pm until 7:30 pm. Please follow these boarding instructions Monday - Friday unless noted otherwise or if operating on a holiday schedule. Affected direction: Inbound Affected trips: 518 (2:15 pm from Worcester) 522 (3:45 pm from Worcester) 588 (4:47 pm from Framingham) 524 (5:20 pm from Worcester) 590 (5:40 pm from Framingham) 526 (6:05 pm from Worcester) 592 (7:05 pm from Framingham)
Agency Route Type Stop Trip
1 CR-Worcester Rail / Train Ashland CR-Weekday-Fall-16-518
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-518
1 CR-Worcester Rail / Train Grafton CR-Weekday-Fall-16-518
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-518
1 CR-Worcester Rail / Train Southborough CR-Weekday-Fall-16-518
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-518
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-518
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-518
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-518
1 CR-Worcester Rail / Train Westborough CR-Weekday-Fall-16-518
1 CR-Worcester Rail / Train Worcester CR-Weekday-Fall-16-518
1 CR-Worcester Rail / Train Ashland CR-Weekday-Fall-16-522
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-522
1 CR-Worcester Rail / Train Grafton CR-Weekday-Fall-16-522
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-522
1 CR-Worcester Rail / Train Southborough CR-Weekday-Fall-16-522
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-522
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-522
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-522
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-522
1 CR-Worcester Rail / Train Westborough CR-Weekday-Fall-16-522
1 CR-Worcester Rail / Train Worcester CR-Weekday-Fall-16-522
1 CR-Worcester Rail / Train Ashland CR-Weekday-Fall-16-524
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-524
1 CR-Worcester Rail / Train Grafton CR-Weekday-Fall-16-524
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-524
1 CR-Worcester Rail / Train Southborough CR-Weekday-Fall-16-524
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-524
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-524
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-524
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-524
1 CR-Worcester Rail / Train Westborough CR-Weekday-Fall-16-524
1 CR-Worcester Rail / Train Worcester CR-Weekday-Fall-16-524
1 CR-Worcester Rail / Train Ashland CR-Weekday-Fall-16-526
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-526
1 CR-Worcester Rail / Train Grafton CR-Weekday-Fall-16-526
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-526
1 CR-Worcester Rail / Train Southborough CR-Weekday-Fall-16-526
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-526
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-526
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-526
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-526
1 CR-Worcester Rail / Train Westborough CR-Weekday-Fall-16-526
1 CR-Worcester Rail / Train Worcester CR-Weekday-Fall-16-526
1 CR-Worcester Rail / Train Ashland CR-Weekday-Fall-16-588
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-588
1 CR-Worcester Rail / Train Grafton CR-Weekday-Fall-16-588
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-588
1 CR-Worcester Rail / Train Southborough CR-Weekday-Fall-16-588
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-588
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-588
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-588
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-588
1 CR-Worcester Rail / Train Westborough CR-Weekday-Fall-16-588
1 CR-Worcester Rail / Train Worcester CR-Weekday-Fall-16-588
1 CR-Worcester Rail / Train Ashland CR-Weekday-Fall-16-590
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-590
1 CR-Worcester Rail / Train Grafton CR-Weekday-Fall-16-590
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-590
1 CR-Worcester Rail / Train Southborough CR-Weekday-Fall-16-590
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-590
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-590
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-590
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-590
1 CR-Worcester Rail / Train Westborough CR-Weekday-Fall-16-590
1 CR-Worcester Rail / Train Worcester CR-Weekday-Fall-16-590
1 CR-Worcester Rail / Train Ashland CR-Weekday-Fall-16-592
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-592
1 CR-Worcester Rail / Train Grafton CR-Weekday-Fall-16-592
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-592
1 CR-Worcester Rail / Train Southborough CR-Weekday-Fall-16-592
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-592
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-592
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-592
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-592
1 CR-Worcester Rail / Train Westborough CR-Weekday-Fall-16-592
1 CR-Worcester Rail / Train Worcester CR-Weekday-Fall-16-592
Please board outbound Worcester Line trains on the inbound platforms at Wellesley Farms through Framingham stations weekdays from 2:30 pm until 7:30 pm. Please follow these boarding instructions Monday - Friday unless noted otherwise or if operating on a holiday schedule. Affected direction: Outbound Affected stops: Wellesley Farms Wellesley Hills Wellesley Square Natick Center West Natick Framingham Affected trips: 515 (2:00 pm from South Station) 517 (3:30 pm from South Station) 589 (3:40 pm from South Station) 519 (4:25 pm from South Station) 591 (4:35 pm from South Station) 521 (5:05 pm from South Station) 593 (5:15 pm from South Station) 523 (5:40 pm from South Station) 525 (5:50 pm from South Station) 527 (6:20 pm from South Station) 529 (6:45 pm from South Station)
Agency Route Type Stop Trip
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-515
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-515
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-515
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-515
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-515
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-515
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-517
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-517
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-517
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-517
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-517
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-517
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-519
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-519
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-519
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-519
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-519
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-519
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-521
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-521
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-521
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-521
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-521
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-521
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-523
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-523
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-523
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-523
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-523
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-523
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-525
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-525
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-525
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-525
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-525
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-525
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-527
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-527
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-527
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-527
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-527
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-527
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-529
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-529
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-529
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-529
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-529
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-529
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-589
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-589
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-589
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-589
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-589
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-589
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-591
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-591
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-591
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-591
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-591
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-591
1 CR-Worcester Rail / Train Framingham CR-Weekday-Fall-16-593
1 CR-Worcester Rail / Train Natick Center CR-Weekday-Fall-16-593
1 CR-Worcester Rail / Train Wellesley Farms CR-Weekday-Fall-16-593
1 CR-Worcester Rail / Train Wellesley Hills CR-Weekday-Fall-16-593
1 CR-Worcester Rail / Train Wellesley Square CR-Weekday-Fall-16-593
1 CR-Worcester Rail / Train West Natick CR-Weekday-Fall-16-593
The South Station Concourse Elevator, which operates to/from the Commuter Rail and Red Line/Silver Line levels, will be out of service through Monday, March 27, due to modernization. During this scheduled outage, please utilize South Station Elevator 926 (located on Atlantic Ave) for access to the Red Line and Silver Line.
Agency Route Type Stop Trip
1 - - 70079 -
1 - - 70080 -
1 - - 74611 -
1 - - 74617 -
The South Station Concourse Elevator, which operates to/from the Commuter Rail and Red Line/Silver Line levels, will be out of service through Monday, March 27, due to modernization. During this scheduled outage, please utilize South Station Elevator 926 (located on Atlantic Ave) for access to the Red Line and Silver Line. Affected routes: Red Line Silver Line - SL1 Silver Line - SL2
Agency Route Type Stop Trip
1 Red Subway / Metro 70079 -
1 Red Subway / Metro 70080 -
1 741 Bus 74611 -
1 741 Bus 74617 -
1 742 Bus 74611 -
1 742 Bus 74617 -
1 746 Bus 74611 -
1 746 Bus 74617 -
The South Station Concourse Elevator, which operates to/from the Commuter Rail and Red Line/Silver Line levels, will be out of service through Monday, March 27, due to modernization. During this scheduled outage, please utilize South Station Elevator 926 (located on Atlantic Ave) for access to the Red Line and Silver Line. Affected routes: Framingham/Worcester Line Needham Line Franklin Line Fairmount Line Providence/Stoughton Line Middleborough/Lakeville Line Kingston/Plymouth Line Greenbush Line
Agency Route Type Stop Trip
1 CR-Fairmount Rail / Train - -
1 CR-Franklin Rail / Train - -
1 CR-Greenbush Rail / Train - -
1 CR-Kingston Rail / Train - -
1 CR-Middleborough Rail / Train - -
1 CR-Needham Rail / Train - -
1 CR-Providence Rail / Train - -
1 CR-Worcester Rail / Train - -
The pedestrian bridge at the Braintree Parking Garage will be closed beginning Tuesday, February 21, through Summer 2020 due to construction. For access to Braintree Station during this closure, travel down to the first floor and use the pedestrian crosswalk to enter the station at the street level. This closure is due to the South Shore Parking Garages Improvements and Renovations Project. The pedestrian bridge will be replaced by a new garage lobby featuring elevators and stairwells. Affected routes: Red Line 210 230 236 Middleborough/Lakeville Line Kingston/Plymouth Line
Agency Route Type Stop Trip
1 Red Subway / Metro 70105 -
1 CR-Kingston Rail / Train Braintree -
1 CR-Middleborough Rail / Train Braintree -
1 210 Bus 38671 -
1 230 Bus 38671 -
1 236 Bus 38671 -
All Orange Line train service will board on the southbound platform at Forest Hills beginning Saturday, March 25, through June 2017, due to the Casey Overpass Project. Affected stops: Forest Hills
Agency Route Type Stop Trip
1 Orange Subway / Metro 70001 -
Silver Line - SL2 detoured beginning Thursday, March 2. No service to 88 Black Falcon. Connections can be made at the corner of Dry Dock Ave & Black Falcon. Affected stops: 88 Black Falcon
Agency Route Type Stop Trip
1 742 Bus 31258 -
1 746 Bus 31258 -
Beginning Monday, 3/20, the Stoughton side of the pedestrian bridge at Canton Junction will be closed for repairs, requiring a 10-15 minute detour around the station to access other platforms. During construction, the station will remain fully accessible and mini-high platforms will remain open. The first phase of this project will repair the Stoughton side of the pedestrian bridge, and is expected to last approximately 3 weeks starting 3/20. Access between Platform D (Stoughton inbound) and A/B/C (Providence outbound/Providence inbound/Stoughton outbound) will require a 10-15 minute walking detour around the station. This means, for example, passengers who take an inbound Providence train, but park on the inbound Stoughton side, will need an additional 10-15 minutes in the morning to access their platform via the sidewalk to the bridge at Spaulding Street. The second phase of this project will repair the Providence side of the pedestrian bridge, and is expected to last
Agency Route Type Stop Trip
1 CR-Providence Rail / Train Canton Junction -
W Broadway @ B St (inbound) moving permanently to the nearside of B Street beginning Fri Mar 17. Affected routes: 9
Agency Route Type Stop Trip
1 9 Bus 163 -
Newburyport/Rockport Line notice: The inbound mini-high platform at Beverly Station is closed for repairs. For those who require it, a portable lift is available. Affected direction: Inbound Affected stops: Beverly
Agency Route Type Stop Trip
1 CR-Newburyport Rail / Train Beverly -
The following stop will be permanently closed beginning Mon Apr 3 due to construction: Western Ave @ Stadium Way (outbound). Please use nearby stops at 125 Western Ave or Western Ave @ North Harvard Street as an alternative. Affected routes: 70 70A
Agency Route Type Stop Trip
1 70 Bus 1069 -
1 70A Bus 1069 -
Routes 8 & 16: Effective Saturday, March 18, all trips may depart the UMass Campus Center earlier than scheduled due to construction. Due to upcoming construction in front of the Campus Center, Route 8 and 16 buses may depart the Campus Center earlier than the published schedule and will not idle. For alternate MBTA service, please use the existing stop near campus, on Mt. Vernon Street by Harbor Point. Buses will depart from Mount Vernon Street at/near scheduled "Leave UMass" department times.
Agency Route Type Stop Trip
1 16 Bus - -
1 8 Bus - -
Buses will replace Red Line service between Braintree and North Quincy Stations, April 8-9, from start to end of service. Due to the Winter Resiliency Improvement Program, buses will replace Red Line trains between Braintree and North Quincy Stations in both directions from start to end of service on the following weekend: -Saturday, April 8, 2017 and Sunday, April 9, 2017 Regular Red Line train service will resume at the start of service on the following Monday. All shuttle bus stops are accessible for persons with disabilities. Shuttling the following stops: North Quincy Wollaston Quincy Center Quincy Adams Braintree
Agency Route Type Stop Trip
1 Red Subway / Metro 70097 -
1 Red Subway / Metro 70098 -
1 Red Subway / Metro 70099 -
1 Red Subway / Metro 70100 -
1 Red Subway / Metro 70101 -
1 Red Subway / Metro 70102 -
1 Red Subway / Metro 70103 -
1 Red Subway / Metro 70104 -
1 Red Subway / Metro 70105 -
Shuttle buses between Kenmore, St. Mary's, and Fenway, replacing Green C branch from Kenmore to St. Mary's and Green D branch from Kenmore to Fenway on April 22 & 23. Due to MBTA crews performing necessary track work, a shuttle bus will operate between Kenmore, St. Mary's (C branch), and Fenway (D branch), replacing Green Line C branch trains between Kenmore and St. Mary's in both directions as well as Green Line D branch trains between Kenmore and Fenway in both directions on Saturday, April 22, and Sunday, April 23, from start to end of service. For westbound Green Line C branch service to St. Mary's and beyond, please board shuttle buses at Kenmore, disembark at St. Mary's, and board regular Green Line C branch train service. For eastbound Green Line C branch service to Kenmore and beyond, please board shuttle buses at St. Mary's, remain on the bus at Fenway, disembark at Kenmore, and board regular Green Line trolley service. For westbound Green Line D branch service to
Agency Route Type Stop Trip
1 Green-C Tram / Streetcar / Light Rail - -
1 Green-D Tram / Streetcar / Light Rail - -
The following stops are permanently closed beginning Sat Mar 25 : North Shore Mall @ Legal Seafood (inbound). Passengers may board buses at the new stop located between Sears and Orvis near the mall entrance. Affected routes: 435 436 465
Agency Route Type Stop Trip
1 435 Bus 7269 -
1 436 Bus 7269 -
1 465 Bus 7269 -
Spring bus route schedules go into effect on Saturday, March 25, 2017. See http://www.mbta.com/busquarterlychanges for full info. Affected routes: Silver Line - SL1 Silver Line - SL2 7 70 79 80 87 88 210 211 216 221 225 230 238 245 350 426 435 436 456
Agency Route Type Stop Trip
1 210 Bus - -
1 211 Bus - -
1 214216 Bus - -
1 216 Bus - -
1 221 Bus - -
1 225 Bus - -
1 230 Bus - -
1 238 Bus - -
1 245 Bus - -
1 350 Bus - -
1 426 Bus - -
1 435 Bus - -
1 436 Bus - -
1 456 Bus - -
1 7 Bus - -
1 70 Bus - -
1 741 Bus - -
1 742 Bus - -
1 746 Bus - -
1 79 Bus - -
1 80 Bus - -
1 87 Bus - -
1 88 Bus - -
Shuttle buses will replace service on the Worcester Line between Wellesley Farms and South Station on 3/31 from approximately 8:30 pm through the end of service. Due to Boston Landing Station construction in Allston, service will be suspended between Wellesley Farms and South Station in both directions on Friday, March 31 from approximately 8:30 p.m. through the end of service. Inbound Framingham/Worcester Line service will terminate at Wellesley Farms where passengers can connect with shuttle buses to Newton, Back Bay, and South Station. Passengers desiring outbound Framingham/Worcester Line service from South Station or Back Bay must board shuttle buses to Wellesley Farms for Commuter Rail connection. Shuttle buses will also depart from Newtonville, West Newton, and Auburndale to Wellesley Farms for outbound Commuter Rail connection. There will be no shuttle bus connection to/from Yawkey Station. Passengers should allow additional travel time of approximately twenty to thirty
Agency Route Type Stop Trip
1 CR-Worcester Rail / Train - -
Shuttle buses will replace service on the Worcester Line between Wellesley Farms and South Station on 4/1 & 4/2 from start to end of service. Service will be suspended between Wellesley Farms and South Station in both directions from start to end of service on Saturday, April 1, and Sunday, April 2, 2017. Inbound Framingham/Worcester Line service will terminate at Wellesley Farms where passengers can connect with shuttle buses to Newton, Back Bay, and South Station. Passengers desiring outbound service from South Station or Back Bay must board shuttle buses to Wellesley Farms for Commuter Rail connection. Shuttle buses will also depart from Newtonville, West Newton, and Auburndale to Wellesley Farms for outbound Commuter Rail connection. There will be no shuttle bus connection to/from Yawkey Station. Passengers should allow additional travel time of approximately 20-30 minutes.
Agency Route Type Stop Trip
1 CR-Worcester Rail / Train Auburndale -
1 CR-Worcester Rail / Train Back Bay -
1 CR-Worcester Rail / Train Newtonville -
1 CR-Worcester Rail / Train South Station -
1 CR-Worcester Rail / Train Wellesley Farms -
1 CR-Worcester Rail / Train West Newton -
1 CR-Worcester Rail / Train Yawkey -
Route 93 detoured from 4:00 PM to 6:00 PM on Sun Mar 26 due to construction. Connections can be made at Devonshire Street @ State Street. Affected stops: Devonshire St @ Milk St (inbound) Pearl St @ Congress St (inbound)
Agency Route Type Stop Trip
1 8993 Bus 11891 -
1 8993 Bus 6548 -
1 93 Bus 11891 -
1 93 Bus 6548 -
Route 64 detoured from 8:00 AM to 12:00 PM on Sun Mar 26 due to the An Ras Mor 5k. Connections can be made at Green Street @ Sidney Street Affected direction: Outbound Affected stops: Franklin St @ Sidney St
Agency Route Type Stop Trip
1 64 Bus 730 -
Route 70/70A detoured from 8:00 AM to 12:00 PM on Sun Mar 26 due to the An Ras Mor 5k. Connections can be made at Green Street @ Sidney Street. Affected direction: Outbound Affected stops: Franklin St @ Sidney St
Agency Route Type Stop Trip
1 70 Bus - -
1 70A Bus - -
Route 39 experiencing minor delays.
Agency Route Type Stop Trip
1 39 Bus - -
Please board all Framingham/Worcester Line trains on the inbound platforms at Ashland and Southborough stations. Affected stops: Ashland Southborough
Agency Route Type Stop Trip
1 CR-Worcester Rail / Train Ashland -
1 CR-Worcester Rail / Train Southborough -
Routes 64 and 70 detoured due to construction stop missed University Park connections made at Green Street & Pearl Street.
Agency Route Type Stop Trip
1 64 Bus - -
1 70 Bus - -
Route 111 experiencing moderate delays.
Agency Route Type Stop Trip
1 111 Bus - -
Route 106 experiencing moderate delays.
Agency Route Type Stop Trip
1 106 Bus - -
Route 66 experiencing minor delays due to traffic.
Agency Route Type Stop Trip
1 66 Bus - -
Route 28 experiencing minor delays.
Agency Route Type Stop Trip
1 28 Bus - -
Route 31 experiencing minor delays.
Agency Route Type Stop Trip
1 31 Bus - -
Route 22 experiencing minor delays due to traffic.
Agency Route Type Stop Trip
1 22 Bus - -
Route 23 experiencing minor delays due to traffic.
Agency Route Type Stop Trip
1 23 Bus - -
Route 504 experiencing minor delays.
Agency Route Type Stop Trip
1 504 Bus - -
Route 202 experiencing minor delays due to traffic.
Agency Route Type Stop Trip
1 202 Bus - -
Route 210 experiencing minor delays due to traffic.
Agency Route Type Stop Trip
1 210 Bus - -
Route 211 experiencing minor delays due to traffic.
Agency Route Type Stop Trip
1 211 Bus - -
Route 212 experiencing minor delays due to traffic.
Agency Route Type Stop Trip
1 212 Bus - -
Route 215 experiencing minor delays due to traffic.
Agency Route Type Stop Trip
1 215 Bus - -
Route 225 experiencing minor delays due to traffic.
Agency Route Type Stop Trip
1 225 Bus - -
Elevator 810 QUINCY CENTER - Red Line Platform to Lobby/Busway unavailable due to maintenance. Use Bus Routes 210, 211, 212, or 215 for connections between Quincy Center and North Quincy.
Agency Route Type Stop Trip
1 - - 70101 -
1 - - 70102 -
Route 96 detoured due to fire - Inbound connections can be made at Medford Sq @ City Hall Parking lot & Winthrop St @ Orchard St - Outbound connections can be made at Winthrop St @ Chester Ave & 37 Riverside Ave @ Medford Sq. Affected stops: George St @ Winthrop St (outbound) George St @ Burget Ave (outbound) George St @ Wedgemere Rd (outbound) George St @ Main St (outbound) 160 Main St (outbound) Main St opp South St (outbound) Salem St opp River St (inbound) Main St @ High St (inbound) Main St @ Emerson St (inbound) Main St @ Summer St (inbound) George St @ Main St (inbound) 55 George St opp Wedgemere Rd (inbound) George St @ Marston St (inbound) George St @ Winthrop St (inbound) Connections: Winthrop St @ Chester Ave (outbound) 37 Riverside Ave @ Medford Sq (outbound) Medford Sq @ City Hall Parking lot (inbound) Winthrop St @ Orchard St (inbound)
Agency Route Type Stop Trip
1 96 Bus 12376 -
1 96 Bus 15038 -
1 96 Bus 21411 -
1 96 Bus 45002 -
1 96 Bus 5002 -
1 96 Bus 5031 -
1 96 Bus 5032 -
1 96 Bus 5034 -
1 96 Bus 5035 -
1 96 Bus 5036 -
1 96 Bus 5037 -
1 96 Bus 5038 -
1 96 Bus 5039 -
1 96 Bus 5040 -
1 96 Bus 5290 -
1 96 Bus 5317 -
1 96 Bus 5319 -
1 96 Bus 63241 -
Route 132 experiencing moderate delays due to traffic.
Agency Route Type Stop Trip
1 132 Bus - -

About This GTFS-RealTime Feed